Waste Water Treatment Facility

img 2617

Team Elmer's has constructed wastewater treatment facilities throughout the state of Michigan.

Our Process

  • Prepare subgrade
  • Deploy PVC liner
  • Install cover layer in sand
  • Install topsoil or stone side slopes (if required)
     

Certifications

  • Confined Space
  • Electrofusion, Butt Fusion, and Extrusion Welding
  • Fresh Air Make-Up Systems (Portable and Stationary)
  • Gas Monitoring Devices
  • H2S Gas Certified
  • Hazwhopper certified
  • Methane awareness training


Related Services

  • Ductile iron pipe installation
  • Influent and effluent piping installation
  • Sprinkler system installation

Home Office:
 

1.800.3ELMERS
231.943.3443
231.943.8975  Fax

P.O. Box 6150
3600 Rennie School Rd.
Traverse City, MI   49685