Rolling on Pine River

1 pine river 017

Project Overview

Challenge: Tight constraints, sensitive area, need to install erosion control measures in specific time frame

Solution: Careful planning, sensitivity to eco-system, repetitive erosion control measures during construction

At Team Elmer’s, we pride ourselves on our ability to overcome any obstacle we encounter. When we were tasked with getting 1,100 tons of 8-inch stone down a 70-foot vertical slope, we had to adapt to get the job done. Faced with the seemingly simple errand of digging up two feet of mud and soil and arranging fabric and rock from the top of the slope to the river’s edge, the topography quickly became treacherous. A steep 2:1 incline created an environment where caution, experience and careful planning were of the utmost importance.

Enter the trademark Elmer’s innovation. We built a gravel road down to the river ... Read more

Project Details

CLIENT
MDOT
LOCATION
Pine River at the Cooley Bridge on M-55
DESIGN ENGINEER
Ken Okert and Rob Kalbfleisch
CONTRACT
196,987

Click image to view larger

 

Home Office:
 

1.800.3ELMERS
231.943.3443
231.943.8975  Fax

P.O. Box 6150
3600 Rennie School Rd.
Traverse City, MI   49685