Challenge: Install box culverts to increase waterflow; replace sanitary and water systems in poor soil.

Solution: Install 66 - 30’ wood pilings to place the pipe on; install 18’x5’ box culverts.

5 inches of rain in six hours. That’s what it took for Kids Creek to rise 1.5 feet in 2020, yet again flooding nearby yards, businesses, and roads.

While the “flashy” creek is well-known for running over quickly with rainstorms, this particular flood was perhaps the first to attract kayakers who enjoyed a leisurely paddle down the street.

Thanks in part to Team Elmer’s, it will likely be their last.

Watershed Center Grand Traverse Bay has been engaged in a 10-year long project to restore the beloved urban stream on the west side of Traverse City, which is currently on the state impair... Read more

Click here to download a PDF of "Kids Creek Box Culverts"

 

Project Details

CLIENT
City of Traverse City
LOCATION
Cedar Street and 6th Street, Traverse City
DESIGN ENGINEER
Timothy J. Lodge, P.E., City Engineer
CONTRACT
2,432,464