Preparing for the Winter Season!The snow is coming! The midwest area may have gotten a small taste of the cold, white stuff a couple weeks ago, however, since then most (if not all) of it has disappeared. But when it does return, we will be ready for it! Our welding team has been working diligently to prepare for the inevitable winter season, repairing and retro-fitting snow-pushers for our front-end loaders. These pushers see quite a bit of use throughout the snowy season, moving seemingly endless mounds of snow from parking lots all around the area. This can wear the originally 5" thick cutting edges to less than an inch and a half, requiring replacement! Aside from the typical wear and tear, our welding team shortened the width and changed the mount location on the back of the pusher to fit some newer Volvo loaders. Get A Load Of This! - Episode 3: Our "behind the scenes" teammates don't always get their share of the spotlight, however, without them our crews in the field would not be as successful as they are!
|
West Side Concrete ProjectsReset the trip meter on your odometer because we're taking another road trip, this time checking in on redi-mix projects throughout the west side of the state!
|