Challenge: Waves and wind
Solution: Waterfront deck to block waves
Team Elmer’s headed out to camp, creating a new facelift for Camp Arcadia’s waterfront. Camp Arcadia is located in Northwest Michigan on the sandy shores of Lake Michigan. Team Elmer’s worked on 780ft of their shoreline and installed 5,000 ton of stone 6ft below water level. They also installed sheet piling which was placed 250ft in front of the deck.
The crew faced weather complications, such as high winds, causing waves to disrupt their work environment. There was also very limited access for trucks to enter the job site. Team Elmer’s subcontracted the concrete finish work out to Bella Concrete. Bella Con... Read more
Team Elmer’s headed out to camp, creating a new facelift for Camp Arcadia’s waterfront. Camp Arcadia is located in Northwest Michigan on the sandy shores of Lake Michigan. Team Elmer’s worked on 780ft of their shoreline and installed 5,000 ton of stone 6ft below water level. They also installed sheet piling which was placed 250ft in front of the deck.
The crew faced weather complications, such as high winds, causing waves to disrupt their work environment. There was also very limited access for trucks to enter the job site. Team Elmer’s subcontracted the concrete finish work out to Bella Concrete. Bella Concrete poured the concrete for the red cross right in front of the Camp’s main building, Wigwam. The wood decking, stairs, and platform were done by Spence Brothers. Team Elmer’s provided site grading, demolition, restoration, seat rocks, sidewalk prep and installation, the wood deck, handrail fire cooking grate, and surveying.
The project was completed in two phases, each completed on time. Camp Arcadia is ready for campers and guests to enjoy their new waterfront.
Date Started: June 2018
Date Completed: Phase 1: July 2018 Phase 2: May 2019
Self-performed: Stone and sheet piling
Partners: Bella Concrete and Spence Brothers